In right around a week and a half we have completed the framing of the second floor. We can now move our operation down to the first floor. And on that first floor, other than the firring of the outside walls there’s not a lot to do.
There were a lot of hiccups in the ceiling of the front, South section of the second floor. There were odd splices, and large gaps and lifted boards from the settling of the eaves. These have all been repaired.
We are also ready to begin setting electrical boxes and stringing the wire on the second floor. I think we will meet our goal of 180 days for initial inspection. But that will also hinge on our contractor’s timeline for the demolition and rebuilding of the bay wall. We are very excited about that process.
Other than the framing overview video above we have uploaded a few other shorts to give you all an idea of what we are dealing with and the progress we have made.